Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13668706

- Product Categories
- Friendly Links
Information Name: | Kunming plastic stadium, excellent riding (certified), plastic stadium |
Published: | 2015-03-16 |
Validity: | 0 |
Specifications: | Limited |
Quantity: | |
Price Description: | |
Detailed Product Description: | Waterborne PU course material silicon three advantages a professional one, one-component material for water-based materials, direct plus we usually diluted with tap water! Safety and environmental protection! Bilayer structure and composition in accordance with the requirements of the international standard indoor venue design, indoor standard form used in outdoor venues a professional sports flooring products, opened a precedent professional outdoor stadium floor of new materials. 2, a special surface - tough with hard plastic stadium, and there is a certain friction coefficient. It can guarantee the players started quickly, moving easily, even more athletes down to earth sense of security. Elastic layer 3, a high rebound value, both to protect the athlete's joints, ligaments to reduce the risk of injury, athletes can increase running speed and improve the competitive level. Second, with a resistance, excellent weather resistance. Not due to environmental change ultraviolet radiation, ozone, rain and high temperature climate fading, chalking, stiff, weak and so on, and long-term to maintain its bright colors. Under normal circumstances, five years does not change color, do not change a decade flexible use of time. 2, excellent wear resistance. To ensure long-lasting stability constant characteristic appearance of the structure, wear resistance, and can meet the needs of long-term use of high frequency. 3, stain resistance and strong surface layer - tough, dense and difficult to be the sole or other hard objects scratch, then it can maintain long-term course clean as new. The course is also suitable for unattended use. Third, the product of each environmental indicators have reached the top of the national health standards of interior decoration, has made environmental certificate. Products in use and the construction process, not produce toxic or harmful substances, is a truly environmentally friendly products. Integrated use of low economic cost, no special maintenance, easy to clean, is the best cost-effective products. Adaptability, can any construction on a variety of solid ground, color, thickness optional. Aqueous Silicon PU Stadium superior performance: an oak wood characteristics, elastic medium, the ball back quickly, without a sense of stagnation legs, bright color lasting, easier to stimulate the potential of two sports, film adhesion strength, hydrophobic, breathable, not muster off, construction quality protection of 3, dry and wet slip good effect, you can use four rain, excellent weather, stain, water resistance, to meet the requirements of all-weather use, routine maintenance easy 5, self-crosslinking silicone enhanced, giving excellent abrasion resistance crack resistance, superior quality 6 of cement foundation, asphalt base, brick, old PU layer, acrylic, epoxy, old wooden floors, metal and other water-based foundation has excellent adhesion to silicon PU finish construction is completed as strengthening layer construction f In the case of no significant dust pollution can be directly within 72 hours finish Guangxi plastic stadium construction, such as beyond the time and must be polished plastic surface treatment. Construction waterborne topcoat points three times. The first pass: Silicon PU Stadium for waterborne two-component material r finish from Group A and Group B curing agent component paint composition ratio of A (waterborne curing agent):? B (water-based paint) = 1:14 (weight ratio). This two-component materials are mixed well, add paint total 330-40% dilution water? Then join the special anti-slip sand (10-15% addition level of finish overall fi), the material stir evenly with a roller or Gun Peng Yulin plastic stadium construction line, this time must be thin coating. Second pass: two-component materials are mixed uniformly, added to the total amount of paint diluted with water followed by addition of 20-30% slip special sand, added in an amount of 10% by weight of AB mixing, the material stir evenly with a roller or? spray. Third time: aqueous topcoat material mixing the two components, adding 20-30% of the total amount of paint diluted with water, without slip sand, the material stir evenly with a roller or spray. ? 5 court based paint can be crossed crossed the finish layer after curing. Marking paint is water-based two-component material timber Tu, where A hardener component for silicon pu plastic stadium, B component is a white paste Component A:? B component = 1:10 (weight ratio), pre-construction before use to proportionally mixing evenly t this marking paint features: green, yellow color change. Size standards in accordance with the court's construction of the boundary position marked S, stickers, ready to use masking along the boundaries on both sides, with a small oil sweep applied directly on the silicon surface layer of PU court must draw marking the site of brushing one or two times draw line paint, until the surface dry tear Masking Kunming plastic stadium, excellent riding (certified), provided by Guangzhou gifted plastic stadium riding sports facilities Engineering Limited. Guangzhou gifted riding sports facilities Engineering Limited (www.youtasports.com.cn) is Guangzhou, exterior coatings leader, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs . Excellent riding in leadership with the staff warmly welcome all inquiries negotiations to create a better future for excellent riding. |
Admin>>>
You are the 112480 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou gifted riding sports facilities Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 112480 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou gifted riding sports facilities Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility