Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13668706
| No.13668706
- Product Categories
- Friendly Links
- home > Supply > How much material silicon PU stadium ball | Zhanjiang silicon material PU Stadium | excellent riding sport
How much material silicon PU stadium ball | Zhanjiang silicon material PU Stadium | excellent riding sport
| Information Name: | How much material silicon PU stadium ball | Zhanjiang silicon material PU Stadium | excellent riding sport |
| Published: | 2015-04-15 |
| Validity: | 0 |
| Specifications: | Limited |
| Quantity: | |
| Price Description: | |
| Detailed Product Description: | Number / Name buffer main material silicon PU stadium stiffeners. Uses for the single-component silicone-modified polyurethane elastic material, combined with science formula design, has a good impact absorption properties, used in sports surface layer system can effectively protect athletes ankle joints and ligaments from injury. The plastic track, basketball courts, tennis courts, volleyball courts, badminton courts and other sports venues pavement ideal timber. Use open after the elastic layer of silicon material pu drums, as appropriate, according to the ambient temperature and humidity construction added 0.1-0.3KG purify water, stir and timely use of professional construction tools paving construction, after the drums turned, once the barrel material to be timely after use. Construction of the base asphalt concrete surface construction in conformity qualified cement base surface base construction or have been the Company's waterproof primer. After the completion of the surface of the material under proper operating conditions, gel curing dry for smooth tough, flexible polyurethane rubber body. But do not rule out because of the quality of the base surface conditions, ingredients inaccurate, improper use of additives, uneven mixing or other owners, some defects caused by objective reasons, such as sticky surface flatness is poor, the strength is not good, there are bubbles, etc. . Notes 1. This product is a polyurethane silicon PU Stadium stiffeners for professional construction personnel. Not free to add construction diluents or fillers, determine the amount of each ingredient according to the construction schedule and the ambient temperature when used, not for the material must always be sealed; 2. The material is suitable for construction temperature range of 5 ℃ ~ 40 ℃; avoid the midday heat surface temperature during construction; 3. Follow the construction design requirements to determine the thickness of the unit area by feeding; 4. Before using this material, please read the product manual material silicon PU Stadium, before and after the construction of the runway can always contact silicon PU material manufacturers with us, so that to achieve the best performance of this product. Waterborne PU finish silicon layer construction such as strengthening the construction is completed in the absence of significant pollution f dust may be made directly to finish construction within 72 hours, such as beyond the time and must be polished plastic surface treatment. Construction waterborne topcoat points three times. The first pass: Silicon PU Stadium for waterborne two-component material r finish from Group A and Group B curing agent component paint composition ratio of A (waterborne curing agent):? B (water-based paint) = 1:14 (weight ratio). This two-component material is uniformly mixed silicon PU material spot sales pitch, adding paint total 330-40% dilution water? Then join the dedicated slip sand (10-15% addition level of finish overall fi), the material fully Stir with a roller or spray gun 逬 line construction, this time to be a thin coating. Second pass: two-component materials are mixed uniformly, added to the total amount of paint diluted with water followed by addition of 20-30% slip special sand, added in an amount of 10% by weight of AB mixing, the material stir evenly with a roller or? spray. Third time: aqueous topcoat material mixing the two components, adding 20-30% of the total amount of paint diluted with water, without slip sand, the material stir evenly with a roller or spray. ? 5 court based paint can be crossed crossed the finish layer after curing. Marking paint is water-based two-component material timber Tu, where A is the curing agent component, B component is a white paste Component A:? B component = 1:10 (weight ratio), adjustment prior to mixing proportions Stir well before use t this marking paint features: green, yellow color change. Size standards in accordance with the court's construction of the boundary position marked S Tennis silicon PU material, stickers, ready to use masking along the boundaries on both sides, with a small oil sweep applied directly on the silicon surface layer of PU court must draw marking the site of James marking paint brush or two times, until the surface of the dry tear Masking material silicon PU stadium much ball | Zhanjiang material silicon PU Stadium | excellent riding sports offered by Guangzhou gifted riding sports facilities Engineering Limited. Guangzhou gifted riding sports facilities Engineering Limited (www.youtasports.com.cn) (www.youtasports.com.cn) strong, credible, in Guangzhou's outdoor paint industry has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead the excellent stepping into the brilliant sports and you work for a better future! |
Admin>>>
You are the 112480 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou gifted riding sports facilities Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 112480 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou gifted riding sports facilities Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility

