Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13668706

- Product Categories
- Friendly Links
- home > Supply > Pu Stadium material silicon manufacturers | Suzhou silicon pu Stadium | excellent riding sport
Information Name: | Pu Stadium material silicon manufacturers | Suzhou silicon pu Stadium | excellent riding sport |
Published: | 2015-05-12 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Silicon PU stadium concrete base temperature must be cut after sewing process cement foundation new casting joints reasonable temperature silicon material pu court how much money one square to the principles of a standard basketball court or tennis court just a standard transverse centerline, cutting two bottom three Temperature Joint Environmental silicon material pu Stadium, lengthwise without cutting, casting must be cut between the temperature of the block construction joints? temperature slit width 5-8mm, deep seam of not less than two-thirds of 20mm (deep seam basis for soil mixed suspect Yi), in order to ensure that the basis to focus on expansion and contraction cracks temperature changes do not result in base elsewhere cracking. After drying foundation, with professional one-component waterproof primer brushing seam and the temperature on both sides, then caulk timber Tu filling in a temperature joints, the best results are slightly lighter than the seam after filling surface 2-3mm, in order to reduce the thermal expansion and contraction of the sealing material basis Tu extrusion affect the surface effect. The exposed portion of the base surface by hand with grinding mill flat base surface? Pu set up a thin space (such as 3mm thick) shall be sewn on both sides of the base surface temperature of each 40-S0mm worn down lS-2.0mm after sealing treatment, to ensure Pu set up after the flatness. Courtside lines, the boundaries of the long side end line of the basketball court, said edges, said the end of the short side of the boundary line. Midline from the sideline in a dotted line parallel to the end line called the center line; midline To sidelines extended by 0.15 meters (15 cm). In the circle to the midpoint of the center line of a circle, with a radius of 1.8m supply of silicon material pu Stadium, draw a circle called the circle. Reasonable collision zone from the center of the ring to draw a floor of 1.25 meters semicircle, this area is called reasonable collision zone disclaimer. Best of silicon PU basketball court materials, Guangzhou excellent riding sport. Pu Stadium material silicon manufacturers | Suzhou silicon pu Stadium | excellent riding sport provided by the Canton excellent riding sports facilities Engineering Limited. Guangzhou gifted riding sports facilities Engineering Limited (www.youtasports.com.cn) (www.youtasports.com.cn) strong, credible, in Guangzhou's outdoor paint and other industries has accumulated a large number of loyal customers. The company better work attitude and constantly improving innovative ideas will lead actor stepped into the brilliant sports and you work for a better future! |
Admin>>>
You are the 112480 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou gifted riding sports facilities Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 112480 visitor
Copyright © GuangDong ICP No. 10089450, Guangzhou gifted riding sports facilities Engineering Limited All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility